Kew the Music

A Serious Stages Case Studies

Project Info:

  • Dates: 16-20 July 2014
  • Duration: 6 weeks
  • Location: Kew Gardens
Share:

‘Kew the Music’ concert series called on us to create a bespoke stage, utilising our in house design and manufacturing departments, that incorporated the blend of curves and lines that characterise Kew’s buildings and greenhouses.

We created a custom stage that had a swept roof shape, with goalpost wings and a 3.6m cantilever for optimum audience sightlines. Front of stage was dressed with custom manufactured scrims, making the overall design unique to Kew the Music and blending with the idyllic surroundings.

Related Case Studies