ELECTRIC DAISY CARNIVAL UK

A Serious Stages Case Studies

Project Info:

  • Dates: 8-10 July 2016
  • Duration: 6 weeks
  • Location: Milton Keynes Bowl
Share:

Our team was tasked with producing a 30m tall by 70m wide stage structure, complete with cascading waterfalls, crystal towers and a giant owls head, synonymous with this magical event. With a surface area of 1,200m₂, in-house structural engineers carried out rigorous loading calculations to ensure the structure could withstand the wind speed and weight-loading capacities required, using over 100 tonnes of ballast.